How to Bid & Deposit

Entry for Bidding Member

Bidders Guide

From Successful Bidding to Payment

・After the Auction Close JEN will send an E-mail to the Successful Bidder and send the Invoice by Fax and at this point the sales contract is concluded. ・Successful Bidder is required to make the complete payment including the equipment price, Contract Fee, Releasing charge, etc. within one week. (The Successful Bidder must cover the Bank Transfer Charges.)
※When the payment is overdue, Late Fee is chargeable on Successful Bidder.

<Please be careful of the "Money Transfer Fraud".>
JEN designates the above Bank Account as the Only Bank Account for auction deals. We will NEVER ask Bidders to send money to any other Bank Account. If you are asked to make payment to any other Bank Account, please contact JEN immediately by telephone


Bank Account
MUFG BANK, LTD. OMORI-EKIMAE BRANCH
Bank Address: 1-2-3, Omori-kita, Ota-ku , Tokyo, 143-0016, Japan
Account Number:0033723 Account Name: JEN CORP. Swift Code: BOTKJPJT

Carry-Out of Equipment and Notes

  • The Successful Bidder is required to give JEN an advance notice, by the previous day of the Carry-Out, about the date/time, and transport company name of the purchased item.
    (Please do not contact the Yard Staff directly.)
  • When there is No advance notice the equipment connot be carried out.
    ※Due to inovitable reasons, he/she may do Carry-Out bat with the payment of "Extra Work Charge" of JPY5,000.

    Phone:+(81)3-5763-8186 E-mail:nyushukko@jencorp.net (Charge:Nakamura and Shinozaki)
  • We may be forced to decline the Carry-Out by the Successful Bidder, if he/she comes with a non-law-abiding vehicle, unsafe truck or trailer.
  • In Case that the Equipment has already [Arrived] at the Delivery Yard by the time of Auction Entry
    • The Successful Bidder is requested to make payment within one week and to carry out the purchased Equipment within two weeks from the Auction Close Day.
      If Carry-Out is not executed by the above deadline, the Storage Fee (See 10-(4)) is chargeable on the Successful Bidder.
  • In Case that the Equipment is still [Coming] to the Delivery Yard at the time of Auction Entry
    • The purchased equipment by the Successful Bidder will arrive in JEN's Designated Delivery Yard within One Week.
      The Successful Bidder is requested to carry out hie/her equipment within three weeks from the Auction Close including the period neccesary for its transnport into the Delivery Yard. If Carry-Out is not executed by the above deadline, the Storage Fee (See 10-(4)) is chargeable on the Successful Bidder.
  • In Case of Carry-Out from "Consigner’s Own Yard"
    • When Successful Bidder is an Overseas Auction Member
    • After the Successful Bidding the purchased Equipment is transported to one of JEN-Designated Exporting Yards. The Successful Bidder will be billed for Inland Trucking Charge specified in the INVOICE.
    • When Successful Bidder is a Domestic Auction Member
    •   ▪ Carry-Out is done in terms of Freight On Board.
    •   ▪ The successful Bidder is required to follow JEN's instructions.
          The Successful Bidder CANNOT contact the Consigner directly to carry out his/her equipment.
    •   ▪  If Carry-Out is not executed within two weeks after the Auction Close, JEN will transfer the equipment to JEN's Designated Delivery Yard.The Successful Bidder is responsible for all the cost incurred from such operation.
    •   ▪  After three weeks from the Auction Day we shall not be responsible for safe storage of Equipment.
  • In Case of Carry-Out from "JEN's Designated Delivery Yards"
    • The Successful Bidder is required to be in charge of the loading work for Carry-Out.
    • Handling ways for Non-Self-Travelling Equipment differ from yard to yard. Please check before the Carry-Out.
  • The Successful Bidder shall be responsible for all the accidents and/or troubles taking place at the time of and after the Carry-Out. JEN shall be exempted from such responsibility.
  • The Successful Bidder shall be responsible for all damages or losses (e.g. oil leakage, sticking, rust, damage to electric system) incurred after the Auction, caused fy any reasons including lapse of time, weather, etc.

Notes of Delivery yard's
Hokkaido

Yard Notes
Reception time(Week day) Reception time(Saturday)
Tomakomai KURIBAYASHI Co., Ltd.(Forwarder)
152-245 Yufutsu, Tomakomai-shi, Hokkaido
9:00-12:00 / 13:00-15:30 9:00-11:30
【In Case of Loading Equipment on a Domestic Vessel】
Parts and Attachments must be put on a pallet and fixed with an annealing wire.
Covering and repair is necessary for oil leakage.
Only such Equipment as can be loaded with 6t Forklift is accepted.
Prior washing is necessary. (Machine with mud or oil dropping on a ship cannot be loaded.)
【In Case of Container Loading at Kuribayashi Co., LTd.】
Excavator with Bucket up to 0.45㎥ (up to PC120 size) can be loaded.
Wheel Loader up to the WA300 size can be loaded.
【In Case of Loading onto Roll-On/Roll-Off Ship (TOKOLINE)】
Non-Self-Travelling Equipment under 20t can be loaded.
Non-Self-Travelling Equipment over 20t cannot be accepted.
No regular RO-RO service price ASK.

Ibaraki Prf.

Tsukuba Rajan Trading Co., Ltd.
1678-1 Hokujo, Tsukuba-shi, Ibaraki Prf.-1
8:00-12:00/13:00-18:00 8:00~12:00

Chiba Prf.

NORI-NARITA NORI-Narita
yard
225-7 Nanae, Tomisato-shi, Chiba Prf.
Phone:+81-476-90-2351, Fax:+81-476-90-2366
9:00~12:00/13:00~17:00 9:00~12:00
  • In general Successful Bidder is responsible for unloading the equipment.
  • For the Carry-Out of Non-Self-Travelling machines (inoperable/box-shaped machines, attachments) we lend a Forklift (handling capacity up to 20t). 
  • NORI Staff can help with Carry-Out operation for inoperable machines, parts, box-shaped machines, attachments, etc. using our availabale machine with the charge of JPY3,000 /one mechahnic per half an hour (charged by the 30min.). Actual expense of the Material is chargeable, if any.
  • As for arrangements and work procedure, please follow the instruction of NORI Staff.
  • There may be a case you cannot carry in your equipment during the period when a Parade Auction is held.

Kanagawa Prf.

Yokohama port-B Eye-Eye TRANS Co., Ltd. (Forwarder)
No.4 Shiei, 279 Yamashita-Cho, Naka-ku, Yokohama-shi Kanagawa Prf.
9:00~11:30/13:00~16:30 9:00~11:30
 
Yokohama port-C KYODO SHOKAI Co., Ltd.(Forwarder)
24-2 Nishiki-Cyo, Naka-ku, Yokohama-shi, Kanagawa Prf
9:00~11:30/13:00~16:30 9:00~11:30
 
Yokohama port-D WAKYO SHOJI Co., Ltd.(Forwarder)
19 Honmoku-futo, Naka-ku, Yokohama-shi, Kanagawa Prf.
9:00~11:30/13:00~15:30 ---
 
Yokohama port-E NISSHIN Co.(Forwarder)
1-10 Honmoku-Futo, Naka-ku, Yokohama-shi, Kanagawa Prf.
9:00~12:00/13:00~16:30 ---
When application is made immediately before 12:00 noon, it may be handled in the afternoon.

Shizuoka Prf.

NORI-KIKUGAWA. Shizuoka-Kikugawa yard
1410 Naka-Uchida, Kikugawa-shi, Shizuoka
Contact us before you carry in your equipment.
  • Operation in place of Consigner for unloading inoperable machines, parts, attachments, etc. using our available machines.
  • In general Successful Bidder is is responsible for unloading the equipment.
  • For the Carry-Out of Non-Self-Travelling machines (inoperable/box-shaped machines, attachments) we lend a Forklift (handling capacity up to 20t).
  • NORI Staff can help with Carry-Out operation for inoperable machines, parts, box-shaped machines, attachments, etc. using our availabale machine with the charge of JPY3,000 /one mechahnic per half an hour (charged by the 30min.). Actual expense of the Material is chargeable, if any.
  • As for arrangements and work procedure, please follow the instruction of NORI Staff.
  • There may be a case you cannot carry in your equipment during the period when a Parade Auction is held.

Osaka

Osaka port-A Marushin Koun Co., Ltd.(Forwarder)
(Ittotsu) 3-8-27 Kaigan-dori, Minatoku, Osaka
(Nanko K-1) 7-1-6 Nanko-minami, Suminoe-ku, Osaka
9:00~11:30/13:00~16:00 9:00~11:30
[Fork lift] 20t

Hyogo Prf.

NORI=KOBE NORI-Kobe yard
4-7 Koyocho-Higashi, Higashinada-ku, Kobe-shi, Hyogo Prf.
Phone:+81-476-90-2351, Fax:+81-476-90-2366
9:00~12:00/13:00~17:00 9:00~12:00
  • In general Successful Bidder is is responsible for unloading the equipment.
  • For the Carry-Out of Non-Self-Travelling machines (inoperable/box-shaped machines, attachments) we lend a Forklift (handling capacity up to 20t). 
  • NORI Staff can help with Carry-Out operation for inoperable machines, parts, box-shaped machines, attachments, etc. using our availabale machine with the charge of JPY3,000 /one mechahnic per half an hour (charged by the 30min.). Actual expense of the Material is chargeable, if any.
  • As for arrangements and work procedure, please follow the instruction of NORI Staff.
  • There may be a case you cannot carry in your equipment during the period when a Parade Auction is held.
Kobe port-A SHOSEN KOUN Co., Ltd.(Forwarder)
9-12 Minatojima, Chuou-ku, Kobe-shi, Hyogo Prf.
9:00~11:30/13:00~16:00 ---
 
Kobe port-B UNI-X ROKKO (Forwarder)
3 kouyoucyou-higashi, Higashi-nada-ku, Kobe-shi, Hyogo
9:00~11:30/13:00~16:00 ---
 
Kobe port-C NISSHIN CORPORATION (Forwarder)
7-6 Minatojima, Chuou-ku, Kobe-shi, Hyogo Prf.
9:00~12:00/13:00~16:30 ---
When application is made immediately before 12:00 noon, it may be handled in the afternoon.

Fukuoka Prf.

Hakata port-B SANKYU Inc. (Forwarder)
2-25-16 Minato-kashii, Higashi-ku, Fukuoka-shi, Fukuoka Prf
9:00~11:30/13:15~16:30 ---

【Forklifts Available for Operations】18t、24t
【In Case of Loading Equipment on a Domestic Vessel】

  • Inoperable machines (including Parts and Attachments) cannot be accepted.
  • Covering and repair is necessary for oil leakage.
  • Prior washing is necessary. (Machine with mud or oil dropping on a ship cannot be loaded.)
  • Machines with parking and foot brakes both working can only be accepted.

【In Case of Container Loading】

Excavator with Bucket up to 0.45m3(up to PC120 size) can be loaded.

【In Case of Loading onto Roll-On/Roll-Off Ship (TOKOLINE)】

  • Non-Self-Travelling Equipment under 20t can be loaded.
  • Shipping Schedule: 2 ships/month (bound for South East Asia; Ports of call depend on load volume.)
Hakata port-C KAMIGUMI (Forwarder)
4-13-13 Hakozaki-futo, Higashi-ku, Fukuoka-shi, Fukuoka Prf.
9:00~12:00/13:00~17:00 ---

【Forklifts Available for Operations】16t、24t
【In Case of Loading Equipment on a Coastal Vessel】

  • Inoperable machines (including Parts and Attachments) cannot be accepted.
  • Covering and repair is necessary for oil leakage.
  • Prior washing is necessary. (Machine with mud or oil dropping on a ship cannot be loaded.)
  • Machines with parking and foot brakes both working can only be accepted.

【In Case of Container Loading 】

Excavator with Bucket up to 0.7m3(up to PC200 size) can be loaded.

【In Case of Loading onto Roll-On/Roll-Off Ship (TOKOLINE)】

  • Non-Self-Travelling Equipment under 20t can be loaded.
  • Shipping Schedule: 2 ships/month (bound for South East Asia; Ports of call depend on load volume.)
Fukuoka Yard-A ARUSA (Forwarder)
1043-5 Kaminofu, Shingu-Machi, Kasuya-gun, Fukuoka Prf.
9:00~11:30/13:00~16:00 ---

【 In Case of Container Loading 】

Excavator with Bucket up to 0.7m3(up to PC200 size) can be loaded.

【In Case of Loading onto Roll-On/Roll-Off Ship (TOKOLINE)】

  • Non-Self-Travelling Equipment under 20t can be loaded.
  • Shipping Schedule: 2 ships/month (bound for South East Asia; Ports of call depend on load volume.)