In case both Auction Entry Yard and Delivery Yard are Consigner’s Own Yard, the delivery of the successfully-sold equipment is conducted in terms of Freight on Board, and Consigner is responsible for the safe storage of the equipment until its Carry-Out.
Washing of your equipment (to the level of no mud by visual inspection) before Auction Entry is requested. If mud removing/washing is necessary after the Carry-In, the costs are chargeable on Consigner.
"We recommend Consigner conduct radiation measurement on your equipment before Auction Entry, and decontamination, if necessary.(If the radiation level is 0.3μSv or over, your equipment cannot be exported.)"
When Consigner carries his/her equipment into the Delivery Yard prior to the Auction Entry, Consigner remains to be the owner until the successful sale, and he/she is responsible for the safe storage
Consigner is requested to carry his/her equipment into the Delivery Yard within one week after the successful sale.
Notes for Carry-In
a)Consigner is responsible for carrying his/her equipment into the Delivery Yard, if it is self-travelling.
b)At the time of Carry-In of inoperable equipment Yard Staff will basically help. However, handling ways may be different from yard to yard. Please check beforehand.
* If you need a specific work (e.g. using a large forklift), contact us two working days before the Carry-In.