CL:Tue.,May.7
First Entry
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245N0076 | AICHI | 2007 | 9862 | NORI-Shizuoka Arrived (搬入済) |
|||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
SV08B / 710040 | JPY 80,000 | 0 | 1d / 11h / 05m | ||||
Feature & Comment |
7.9m 250kg, WHEEL Battery condition and Battery charger operation are not confirmed バッテリーの状態及び充電装置の動作未確認 Inland Trucking Charge to Yokohama port JPY70,000 横浜港までの国内回送費 70,000円 |
CL:Tue.,May.7
First Entry
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245N0077 | AICHI | 2007 | 7189 | NORI-Shizuoka Arrived (搬入済) |
|||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
SV08B / 712090 | JPY 80,000 | 0 | 1d / 11h / 05m | ||||
Feature & Comment |
7.9m, 250kg, WHEEL Battery condition and Battery charger operation are not confirmed バッテリーの状態及び充電装置の動作未確認 Inland Trucking Charge to Yokohama port JPY70,000 横浜港までの国内回送費 70,000円 |
CL:Tue.,May.7
First Entry
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245N0063 | YANMAR | 2011 | 1898 | NORI-Shizuoka Arrived (搬入済) |
|||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
SV08-1A / 16229B | JPY 450,000 | 0 | 1d / 10h / 51m | ||||
Feature & Comment |
180R, EPA Inland Trucking Charge to Yokohama port JPY70,000 横浜港までの国内回送費 70,000円 |
CL:Tue.,May.7
First Entry
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245N0159 | N/A | N/A | NORI-Kobe Arrived (搬入済) |
||||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
SLOPE-BKT-FOR-VIO70 / REF24000950 | JPY 50,000 | 0 | 1d / 11h / 04m | ||||
Feature & Comment |
Operation Not Confirmed and also not checked Damage and Missing parts 動作未確認、また目視での破損・欠品も確認していない |
CL:Tue.,May.7
First Entry
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245N0160 | N/A | N/A | N/A | NORI-Kobe Arrived (搬入済) |
|||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
SLOPE-BKT-FOR-U-30-5 / REF24000951 | JPY 50,000 | 0 | 1d / 11h / 04m | ||||
Feature & Comment |
Operation Not Confirmed and also not checked Damage and Missing parts 動作未確認、また目視での破損・欠品も確認していない |
CL:Tue.,May.7
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245N0094 | N/A | N/A | N/A | NORI-Narita Arrived (搬入済) |
|||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
SKELETON-BUCKET-FOR-0.7 / REF23010895 | JPY 120,000 | 0 | 1d / 11h / 04m | ||||
Feature & Comment |
FOR 0.7m3 |
CL:Tue.,May.7
First Entry
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245N0151 | KOBELCO | 2002 | 6245 | NORI-Kobe Arrived (搬入済) |
|||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
SK75UR-3E / YR05-05491 | JPY 1,150,000 | 0 | 1d / 10h / 51m | ||||
Feature & Comment |
450G+PAD, ARM CRANE, A/C, MULTI, EPA |
CL:Tue.,May.7
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245N0097 | KOBELCO | 2002 | 7151 | NORI-Narita Arrived (搬入済) |
|||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
SK75UR-3 / YR04-05150 | JPY 1,400,000 | 0 | 1d / 10h / 51m | ||||
Feature & Comment |
450G+PAD, BLADE, ARM CRANE, A/C, MULTI |
CL:Tue.,May.7
First Entry
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245N0010 | KOBELCO | 2014 | 7917 | NORI-Kobe Arrived (搬入済) |
|||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
SK75SRD-3 / YT07-27490 | JPY 80,000 | 1081**** | 5 | 1d / 10h / 50m | |||
Feature & Comment |
450G, Piping 建機工譲渡書あり |
CL:Tue.,May.7
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245K0090 | KOBELCO | 1997 | 10707 | Consignors Yard Arrived (搬入済) |
|||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
SK60 / LE-21860 | JPY 1,180,000 | 0 | 1d / 10h / 52m | ||||
Feature & Comment |
450R, Blade, A/C Ex-Shiroishi Town,Saga Pref. 佐賀県杵島郡白石町渡し Inland Trucking Charge to Hakata port JPY50,000 博多港までの国内回送費 50,000円 |
CL:Tue.,May.7
First Entry
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245K0094 | KOBELCO | 2014 | 7630 | Osaka Port-A Coming (未搬入) |
JPY 15,000 | ||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
SK55SR-6 / PS03-05108 | JPY 1,950,000 | 0 | 1d / 10h / 51m | ||||
Feature & Comment |
400G, CNP, Blade, Piping |
CL:Tue.,May.7
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245K0138 | KOBELCO | 2000 | 7216 | Consignors Yard Arrived (搬入済) |
|||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
SK45SR / PY06-07360 | JPY 1,000,000 | 0 | 1d / 10h / 52m | ||||
Feature & Comment |
400G, CAB, Blade EX-Tomisato City, Chiba Pref. 千葉県富里市渡し Inland Trucking Charge to Yokohama port JPY45,000 横浜港までの国内回送費 45,000円 |
CL:Tue.,May.7
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245N0018 | KOBELCO | 2010 | 9103 | NORI-Kobe Arrived (搬入済) |
|||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
SK350DLC-8 / YC11-04669 | JPY 6,700,000 | 0 | 1d / 10h / 51m | ||||
Feature & Comment |
600G, 5 PIPING, A/C, MULTI, W/3 SECTION BOOM, W/BKT MAIN BODY&BKT: NORI KOBE YARD, 3 SECTION BOOM : KOBE PORT E 本体:ノリ神戸ヤード, 3段解体ブーム: 神戸ポートE |
CL:Tue.,May.7
First Entry
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245N0130 | KOBELCO | 2017 | 2125 | NORI-Kobe Arrived (搬入済) |
|||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
SK30SR-6 / PW15-52256 | JPY 1,800,000 | 0 | 1d / 10h / 51m | ||||
Feature & Comment |
300R, CNP, BKT, 2WAY MULTI, MASTER KEY |
CL:Tue.,May.7
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245K0084 | KOBELCO | 1999 | N/A | Hakata Port-C Coming (未搬入) |
JPY 5,000 | ||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
SK25SR / PV10561 | JPY 700,000 | 0 | 1d / 10h / 52m | ||||
Feature & Comment |
R, Fork, CNP, Blade, Multi, w/STD BKT Hour meter display doesn't work アワーメーター故障 |
CL:Tue.,May.7
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245K0143 | KOBELCO | 2019 | 24457 | Yokohama Port-B Arrived (搬入済) |
JPY 10,000 | ||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
SK235SRD-5 / YF08-04194 | JPY 3,850,000 | 0 | 1d / 10h / 52m | ||||
Feature & Comment |
800G, Hyd.Thumb, Piping, M/L, A/C |
CL:Tue.,May.7
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245K0142 | KOBELCO | 2016 | 22543 | Yokohama Port-B Arrived (搬入済) |
JPY 10,000 | ||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
SK235SRD-3 / YF07-03263 | JPY 3,200,000 | 0 | 1d / 10h / 53m | ||||
Feature & Comment |
800G, Elevetor-CAB, Hyd.Thumb, M/L, A/C |
CL:Tue.,May.7
First Entry
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245K0016 | KOBELCO | 1990 | 8936 | Consignors Yard Arrived (搬入済) |
|||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
SK200-1 / YN-6165 | JPY 2,250,000 | 0 | 1d / 10h / 51m | ||||
Feature & Comment |
600F, High-CAB, Magnet, Hyd.Thumb, M/L, A/C Ex-Nagaoka City, Niigata Pref. 新潟県長岡市渡し Inland Trucking Charge to Yokohama port JPY200,000 横浜港までの国内回送費 200,000円 |
CL:Tue.,May.7
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245K0075 | KOBELCO | 2016 | 4984 | Tomakomai City-A Arrived (搬入済) |
JPY 5,000 | ||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
SK135SR-3 / YY07-28890 | JPY 4,300,000 | 0 | 1d / 10h / 52m | ||||
Feature & Comment |
600G, ROPS, Piping, Arm Crane, Blade, A/C, Multi Inland Trucking Charge to Tomakomai port JPY15,000 苫小牧港までの国内回送費 15,000円 |
CL:Tue.,May.7
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245N0001 | KOBELCO | 2011 | 5421 | NORI-Kobe Arrived (搬入済) |
|||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
SK135SR-2 / YY06-16221 | JPY 3,200,000 | 0 | 1d / 10h / 51m | ||||
Feature & Comment |
500G+PAD, PIPING, ARM CRANE, A/C, MULTI, EPA, MASTER KEY, IC KEY |
CL:Tue.,May.7
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245N0100 | KOBELCO | 2013 | 6739 | NORI-Narita Arrived (搬入済) |
|||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
SK135SR-2 / YY06-19252 | JPY 3,400,000 | 0 | 1d / 10h / 51m | ||||
Feature & Comment |
500G+PAD, BLADE, ARM CRANE, A/C, MULTI, MASTER KEY |
CL:Tue.,May.7
First Entry
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245N0173 | KOBELCO | 2015 | 3961 | NORI-Narita Arrived (搬入済) |
|||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
SK130SR+-3 / YV07-10515 | JPY 2,750,000 | 0 | 1d / 10h / 51m | ||||
Feature & Comment |
500G+PAD, ROPS CAB, ARM CRANE, A/C, MULTI |
CL:Tue.,May.7
First Entry
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245N0082 | KOBELCO | 2017 | 2793 | NORI-Narita Arrived (搬入済) |
|||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
SK125SR-3 / YV07-11298 | JPY 3,650,000 | 0 | 1d / 10h / 51m | ||||
Feature & Comment |
500G+PAD, ROPS CAB, COM-PIPING, ARM CRANE, A/C, MULTI |
CL:Tue.,May.7
First Entry
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245N0008 | KOBELCO | 1994 | 7641 | NORI-Kobe Arrived (搬入済) |
|||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
SK120-2 / LP-11961 | JPY 30,000 | 1081**** | 2 | 1d / 10h / 50m | |||
Feature & Comment |
500G, PIPING, A/C |
CL:Tue.,May.7
First Entry
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245N0013 | KOBELCO | 1984 | N/A | NORI-Kobe Arrived (搬入済) |
|||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
SK09 / LQ01158 | JPY 100,000 | 0 | 1d / 10h / 50m | ||||
Feature & Comment |
800G Hour meter display doesn't work アワーメーター故障 |
CL:Tue.,May.7
First Entry
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245N0153 | KOBELCO | N/A | 2829 | NORI-Kobe Arrived (搬入済) |
|||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
SK013 / PN00656 | JPY 350,000 | 0 | 1d / 10h / 51m | ||||
Feature & Comment |
230R, 2WAY MULTI |
CL:Tue.,May.7
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245K0080 | KOMATSU | Consignors Yard Arrived (搬入済) |
|||||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
Shoe-Link-for-PC300-5 / JEN23008161 | JPY 70,000 | 1081**** | 7 | 1d / 10h / 51m | |||
Feature & Comment |
Shoe-Link-for-PC300-5, Some link broken 切断箇所有り Ex-Tsu City, Mie Pref. 三重県津市渡し Inland Trucking Charge to Osaka port JPY60,000 大阪港までの国内回送費 60,000円 |
CL:Tue.,May.7
First Entry
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245N0011 | SUMITOMO | N/A | 3960 | NORI-Kobe Arrived (搬入済) |
|||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
SH75X-3B / BB8681 | JPY 60,000 | 1081**** | 6 | 1d / 10h / 50m | |||
Feature & Comment |
450G, Blade, Piping, W/Gray Key |
CL:Tue.,May.7
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245N0034 | SUMITOMO | 2014 | 3064 | NORI-Shizuoka Arrived (搬入済) |
|||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
SH75X-3B / SD1481 | JPY 2,220,000 | 0 | 1d / 10h / 51m | ||||
Feature & Comment |
450G+PAD, BLADE, ARM CRANE, A/C, MULTI Inland Trucking Charge to Yokohama port JPY80,000 横浜港までの国内回送費 80,000円 |
CL:Tue.,May.7
|
Auction No. | Maker | Year | Meter Reads | Delivery Yard | Releasing Charge | |
---|---|---|---|---|---|---|---|
245N0107 | SUMITOMO | 2012 | 3925 | NORI-Narita Arrived (搬入済) |
|||
Model / Serial | Current Bid | Bidder No. | Bids | Time Left | |||
SH75X-3B / SD8557 | JPY 2,450,000 | 0 | 1d / 10h / 51m | ||||
Feature & Comment |
450G+PAD, BLADE, ARM CRANE, A/C, MASTER KEY |
To New Auction Members:
You must bank security deposit to JEN CORP by the day before the closing day of the Auction to bid in the currently-held Auction .
About Rediation:
Equipments have already undergone the Radiation Examination.
However, we don't give any guarantee for it because it is possible that there is a margin of error for value of radiation depending on checking environment. If you need a certificate, Additional Charge is Required.